01
The mandate

Power sectors must cut emissions they have already contracted for

Governments have committed to lower emissions, and the power sector carries much of that load. Most of its emissions come from fossil plants that already exist, many of them under contracts that run for decades.

Those cuts have to come without risking a reliable grid or raising the cost of electricity. New renewables help, but they are added alongside the fossil fleet, not instead of it.

Fossil power 82.4% of generation, much of it under long-term contracts Renewables, added alongside 17.6% of generation then now
Thailand, domestic electricity generation in 2024: 169.9 TWh fossil, 36.2 TWh renewable. Source: Worldometer. Earlier years are illustrative.
02
SPARC
The constraint

Existing rights have to be respected

A fossil power contract gives its plant rights for decades: to generate, to be paid and, with that, to emit. Investors financed the plant on those rights.

Policy can change direction. It cannot simply take those rights away without legal disputes, higher costs for electricity customers and a weaker investment climate.

Illustrative contract. Many fossil plants in Southeast Asia were built in the past fifteen years and are still recovering their capital.
03
SPARC
The tools today

Each tool solves part of the problem

Governments need four things at once: lower emissions from the plants already running, a reliable grid, affordable electricity and respect for existing contracts.

Each tool in use today delivers some of these. None was built to deliver all four.

Cuts emissions from plants already running
Keeps the grid reliable
Keeps electricity affordable
Respects existing contracts
New renewable tenders
Early-retirement buyouts
Carbon pricing
SPARC
Does thisIn partDoes not
Assessment by SPARC Labs, for tools as commonly applied to contracted fossil plants.
04
SPARC
The main route

Buyouts ask for all or nothing

Closing plants early has been the main route. Even with real money and effort behind it, the flagship deal did not close.

A buyout must pay for every remaining contract year, up front, before a single tonne is avoided.

December 2023
Deal announced
Cirebon-1, Indonesia, 660 MW
2024 to 2025
Three years of talks
Operator, government, lenders and carbon buyers must all agree
December 2025
Plan dropped
No plant in the $21.4 billion programme has closed
Sources: Reuters, 3 December 2023; The Jakarta Post, 11 December 2025; SPARC Labs research notes.
05
SPARC
The difference

Ten times smaller to start, with no buyout and no broken contract

SPARC works inside the contract instead of ending it. It starts with one share of one contract and grows step by step, instead of waiting for one deal on the whole plant.

Payment follows delivery, and every carbon claim rests on metered MWh. The evidence comes first, not a model of what might happen.

SPARC does not replace retirement programmes. It makes their final step smaller and cheaper.
06
SPARC
SPARC.
No buyoutThe contract is not bought out. Payment follows delivery.
IntactExisting contracts and rights stay in force.
1 MWhThe unit SPARC works in. Start small, then grow.

Green, from the inside out.